Modelo 101
101 — The Modernist
A high-performance, panelized home designed for modern living. Engineered with advanced wall systems and sustainable materials for superior energy efficiency.
1260
sq ft
3
Bedrooms
2
Bathrooms
$254K
DIY From
$444K
Installed From

Especificaciones rápidas
Footprint
1260 sq ft
Building Size
23 × 33'
Roofing
Trusses
BC Step Code
Step Code Level 3
Build Time
14 Weeks
Recorre la construcción
Por dentro del 101 — The Modernist.
Pasa el cursor sobre cualquier foto con la insignia 📍 Plano para resaltar el cuarto correspondiente en el plano.

101-THE MODERNIST
Características y sistemas
Lo que lleva cada 101 — The Modernist.
Structure
- •Engineered timber floor joists at 19.2" o.c.
- •Panelized 2x6 wood frame walls
- •Engineered roof trusses
- •Concrete foundation system
Envelope
- •Rain Screen and Vapor Barrier
- •R-22 wall insulation
- •R-40 attic insulation
- •Double-pane windows
Mechanical
- •Cold-climate cold-source heat pump
- •HRV with HEPA-grade filtration
- •Heat-recovery domestic hot water (Hybrid)
- •200A main service panel (EV-ready)
Interior Finishes
- •Quartz countertops throughout
- •Soft-close cabinetry, panelized doors
- •8' ceilings on main floor
- •Low-VOC paints and engineered finishes
Desglose del sistema de muros
Ingeniería panel a panel.
- •Panelized wood-frame construction
- •Factory-controlled quality at every stage
- •Continuous exterior insulation
- •Built-in service cavity for wiring + plumbing

- •Engineered for code compliance + high snow loads
- •Double-pane window upgrade available
- •3rd-party tested for air-tightness
- •Days, not weeks, to assemble on-site
Especificaciones detalladas
La ficha técnica completa.
| Componente | Material | Especificación | Notas |
|---|---|---|---|
| Foundation | Concrete Forms | 8" / 8" wall | Torch On Membrane Foundation Waterproofing |
| Floor System | 2X10 or Engineered joists | 11.875" / 19'2" o.c. or TJI 9.5 | OSB sub-floor adhered + screwed |
| Exterior Walls | Wood or Steel Stud 2x6 | 9'0 tall, 16" o.c. studs | Continuous R-value > 22 |
| Windows | Vinyl/Double Pane | U 0.18 / SHGC 0.30 | Triple-pane upgrade available |
| Roofing | Standing Seam Metal | 26-gauge, 16" panel | 40-yr finish warranty |
| HVAC | Cold Weather Heat Pump | 9 SEER / HSPF 12.5 / -25°C | |
| Ventilation | High-Efficiency HRV | 200 CFM, 80% recovery | HEPA-13 filtration |
Comparación de desempeño
El rendimiento del 101 — The Modernist.
Energy Efficiency25%
lower energy loss than conventional build average
Structural Strength85%
Exceeds NBC 2020 by 40%
Build Speed88%
14 weeks vs. 32 weeks site-built
Air Tightness60%
2.50 ACH50
Costos operativos anuales
New Leaf Construcción convencional
JanFebMarAprMayJunJulAugSepOctNovDec
Documentos
Planos arquitectónicos.
Recorrido virtual
Míralo en acción.
Ubicación y disponibilidad
Dónde entregamos.
Entrega disponible dentro de 1,500 km de cualquier instalación de New Leaf Vision. Los tiempos de entrega dependen de la configuración y la cola de producción vigente.
Cargando mapa…
BC + Alberta
Available —10 week lead time
Ontario + Quebec
Available — 12 week lead time
West United States
Available —10 week lead time
Nova Scotia
Available —14 week lead time
Comienza tu proyecto
¿Listo para construir tu 101 — The Modernist? Nuestro equipo te guiará en cada etapa, desde la evaluación del terreno hasta las llaves en mano.
1
2
3
Cuéntanos sobre tu proyecto
Te conectaremos con el modelo adecuado y los precios de tu región.
101 — The Modernist
